FCC Licensing Custom Order
$0.00
We started our FCC licensing assistance practice in 2000 (more than 20 years ago), which is when the FCC Universal Licensing System (ULS) was first introduced
We offer Custom FCC licensing assistance, including filing preparation, and licensing consulting as to frequency band, mode, protocol/emission type
We track license expiration dates and we help prevent you from letting your licenses expire
We offer complete FCC Licensing Schedule K construction buildouts as a part of our service which prevents the loss of your license for not meeting regulatory requirements
We offer Same Day Service
We receive approvals from FCC Licensing Coordinators in a fraction of the time compared to other vendors
Our pricing is typical in the industry but few vendors can provide the same high level of time service and individualized attention.
In most cases, FCC licensing is valid for a period of 10 years with a much smaller renewal fee every 10 years thereafter.
FCC licensing and compliance with FCC regulations is the sole responsibility of the Two Way Radio user.
The cost for this service includes:
RF Licensing Consulting
Licensing Preparation and Application Filing
Notification of Construction – Schedule K Completion
3rd Party Coordinator Fees
FCC Application and Regulatory Fees
NOTE:
This service link is specifically sent to specific customers for special circumstances. If the person browsing this product was not specifically referred to this page by us, please do not attempt to order this service.
Once the application process has begun, there are NO refunds or returns permitted as in most cases, fees to 3rd parties and to the FCC have been already accrued and paid.
Credit card fees have been added to the total price.
Out of stock
CHANGES THAT REQUIRE AN FCC LICENSE NOTIFICATION OR FCC LICENSE MODIFICATION
Mailing Address Change
Name Change
Change of Ownership
Change in Control Address
Increase / Decrease number of mobile/portable units
Add control Stations
Change in transmitter
Increase/Decrease antenna Height
Change Area of Operations
Location Increase/Decrease output power
Add / Delete transmitter sites
Add / Delete Frequencies
FCC FINES FOR VIOLATIONS
Construction and/or operation without an instrument of Authorization (license) for the service $10,000
Exceeding power limits $4,000
Exceeding authorized antenna height $5,000
Using unauthorized frequency $4,000
Construction or operation at unauthorized location $4,000
Failure to comply with prescribed lighting and marking $10,000
Unauthorized substantial transfer of control $8,000
Violations of rules relating to distress and safety frequencies $8,000
Failure to permit inspection $7,000
Violations of rules relating to distress or safety frequencies $8,000
Interference $7,000
Failure to respond to Commission communications $4,000
Importation or marketing of unauthorized equipment $7,000
Unauthorized emissions $4,000
Transmission of indecent/obscene material $7,000
Unauthorized discontinuance of service $5,000
Use of authorized equipment $5,000
Failure to engage in required frequency coordination $4,000
Failure to file required forms or information $3,000
Failure to make required measurements or conduct required monitoring $2,000
Unauthorized pro forma transfer of control $1,000
Failure to provide station ID $1,000
Miscellaneous Violations $1,000